[{"value":"utm_source","text":"00N0I00000KT1fD"},{"value":"utm_medium","text":"00N0I00000KT1fI"},{"value":"campaignname","text":"00N0I00000KT1fN"},{"value":"uterm","text":"00N0I00000KT1fS"},{"value":"adgroupname","text":"00N0I00000KT1md"},{"value":"keyword","text":"00N0I00000KT1mx"},{"value":"creative","text":"00N0I00000KT1nR"},{"value":"devicemodel","text":"00N0I00000KT1ng"},{"value":"placement","text":"00N0I00000KT1nq"},{"value":"target","text":"00N0I00000KT1ot"},{"value":"device","text":"00N0I00000KT1o0"},{"value":"network","text":"00N0I00000KT1o5"},{"value":"matchtype","text":"00N0I00000KT1oA"},{"value":"gclid","text":"00N0I00000KT1oF"},{"value":"campaignname","text":"00N0I00000KT1nM"},{"value":"term","text":"00N0I00000KT1n7"}]
Job Title: |
Manager/Sr. Manager |
Function: |
Operations |
Name of the Job Holder: |
|
Location: |
Hyderabad |
Reports to position: |
Director/Sr.Associate Director -Operations |
Band: |
|
Reportees to Position: |
|
|
|
Job Purpose |
To provide safe and secure work environment by maintaining world class infrastructure up to the required standards. Maintenance of civil infrastructure, plumbing, external drainage, minor projects and working knowledge of Auto cad, SAP & BAZ.
|
Job Outline |
The incumbent will report to the Director/Sr. Associate Director-Operations.
Hyderabad campus of ISB is LEED- Platinum rated and spread across 260 acres with Approx 80 Acres of built-up area (13.20 Lakh Sqft) with many operational buildings at present and expanding further.
Responsibilities:
Requirements:
Team Collaboration
Cost conscious
Equipment Health & Safety
Environmental Condition
Vendor management
Team leader
|
Job Specification |
||
Knowledge: |
Qualification |
B.Tech (Civil). |
Skills: |
Technical |
Civil and Plumbing, ACAD. |
Behavioral |
Good interpersonal skills/Communicator |
|
Experience: |
8-10 years |
Job Interface/Relationships: |
|
Internal |
External |
|
|
S.N |
Key Responsibilities |
% Time Spent |
1 |
Complaint management system in respective stream. |
15% |
2 |
Operation & maintenance Plumbing & sanitary system. |
15% |
3 |
Design and execution of retrofit jobs |
10% |
4 |
Maintaining the building infrastructure upkeep |
10% |
5 |
Reduction in water consumption and reduce leakages |
15% |
6 |
Water proofing to arrest seepages/leakages |
15% |
7 |
Saving of R&M equipments cost |
10% |
8 |
Procurement of spare parts & consumables as per LEED requirement |
10% |
SN |
Key Result Area |
Key Performance Indicator |
Measure |
Weight |
1 |
Retrofit jobs |
Timely completion |
To be completed within the committed time |
20% |
2 |
Sanitary/Plumbing |
Attending the complaints/requests raised and resolved with minimum time and cost. |
Ensure no leakages in the plumbing fixtures |
20% |
3 |
Safe environment |
Monitoring the wok time to time and assignment and closure of job on time. |
No water seepage |
20% |
4 |
Painting schedule |
To prepare the schedule and adherence to it |
Infrastructure upkeep |
10% |
5 |
Minor labour works |
Utilizing our own resources |
To be completed within specified time |
10% |
6 |
Inventory management |
Raising the PR in time and co –ordination with commercials to deliver the material in time. |
Completion of works in specified time. |